21 days update: things are rolling

21 days until our trip, and we’ve got momentum on the big projects. the kitchen is still sitting at around 90% complete. have to caulk, paint, and install the stick-down floor. oh and finish sealing the countertops/backsplashes.

bathroom is where it’s really happening. tub surround and floor are tiled & grouted. tub plumbing (supply & waste) are done & solid (no leaks). lighting & GFCI outlet installed.

drywall installed, taped & first mud coat (thanks, ross!). shower tile & grout partially sealed. tonight, 2nd coat of mud (thanks again, ross!) finish sealing grout & tile. then maybe switch our attention back to the kitchen while we wait for the bathroom floor sealer to cure.

fun! i look forward to not working 15 hrs/day on the weekends. this vacation will truly be a vacation!