skip to content
mikesusz

sneak preview: kitchen

okay, here’s a sneak preview of the kitchen. the marble & backsplash have 3 coats of sealer, so it’s essentially done.

kitchen counters

for those that have seen the kitchen “before” you know this is a big deal. heh.

20 Jul 2007

foggy in seattle

forgot to post this yesterday. was foggy downtown – i’ve never seen this outside of winter here. definitely not in mid-july.

foggy day in seattle

21 days update: things are rolling

21 days until our trip, and we’ve got momentum on the big projects. the kitchen is still sitting at around 90% complete. have to caulk, paint, and install the stick-down floor. oh and finish sealing the countertops/backsplashes.

bathroom is where it’s really happening. tub surround and floor are tiled & grouted. tub plumbing (supply & waste) are done & solid (no leaks). lighting & GFCI outlet installed.

16 Jul 2007

caulk is cheap

sometimes i wonder what previous owners were thinking when they did these things.

002

001

on second thought … i don’t really want to know.

13 Jul 2007

i hurt everywhere

so, 29 total hours into the kitchen & miscellany this weekend (15 saturday, 14 sunday). got the wainscoting demo’ed, rehung the cabinets, demo’ed countertops, demo’ed sink, installed plywood/hardibacker. our kitchen/bathroom/tile/interior decorator got started on the tile on countertops and backsplashes – 1/2 the kitchen is tiled now.

oh, in brief interludes i also mowed the lawn, built a large pressure-treated planter, thatch raked and reseeded parts of the lawn. ugh.

hairy legs & hopper

one more cute photo of hopper, contentedly sleeping on my hairy legs the day we got back to seattle.

0605071648.jpg

19 Jun 2007